Sample essay on personal work summary of water conservancy (general 5 articles)
Time flies, and a period of work has ended. Looking back on the work during this period, both theoretical knowledge and professional level have improved. It has been greatly improved and a work summary needs to be written seriously. Before writing, you can refer to the sample essay first. The following is a sample essay on water conservancy personal work summary that I carefully compiled (5 general articles). Everyone is welcome to learn from and refer to it. I hope it will be helpful to everyone.
Summary of personal work on water conservancy 1
This year, under the leadership of the Municipal Water Conservancy Society, I worked actively, pioneered and innovated, loyally served the development of water conservancy construction and water conservancy economy, and in order to promote ecological Certain achievements have been made in the healthy and sustainable development of water networks. The main work situation in 20xx is summarized as follows:
1. Carry out refined management and maximize the benefits of the ecological water network project
Our office is mainly responsible for the management and management of the city's ecological water network project Operation, in order to scientifically dispatch water sources and ensure the safe operation of the ecological water network, especially in view of the fact that the city's groundwater storage capacity is seriously insufficient this year, we have carefully formulated plans and plans, implemented strict dispatch, and organized personnel to conduct inspections at any time to better control The water levels of water conservancy hubs and channels have been controlled; the city's water sources have been strictly and scientifically dispatched to ensure good order and safety of water supply.
This year is the most severe situation since the ecological water network was put into operation. During the period when water sources are most tense, the water storage capacity of the two major reservoirs, Yuecheng and Dongwushi, is only 54 million m3 and 48.4 million m3 respectively. , the water shortage situation is worse than in 20xx. In order to ensure the normal operation of the ecological water network and ensure the safety of the city's industrial and agricultural production, the whole department first establishes the concept of "water is more expensive than oil and cannot be wasted", carefully schedules and scientifically manages the Fuyang River system, except during the peak period of agricultural irrigation. It has always adhered to high water level and low flow operation, even operating around the warning water level. The second is to make effective use of rainwater resources, give full play to the role of sluice and culvert hubs such as Zhangzhuangqiao and Lianhuakou along the river, and use flexible dispatching methods to retain water sources step by step and use them effectively. The third is to carry out extensive publicity in response to the severe drought situation, asking the masses to change the planting structure and sow more drought-resistant crops. Throughout the year, the water network irrigated 1.35 million acres of farmland, of which 504,500 acres were irrigated under controlled and managed trunk and branch canals, and 680,000 acres were irrigated, making a contribution to ensuring a bumper agricultural harvest in the city.
2. Actively organize cadres and employees to participate in various studies and trainings to improve their technical level
Actively organize relevant cadres and employees throughout the department to participate in various professional business training courses organized by superiors, and participate in Various trainings for accountants, accountants, legal representatives, human resources, etc., and self-study and training in water transfer, water use, water management, etc. through department meetings and department plenary meetings. The cadres and employees of the department also participated in "recharging" studies in hydrology, water resources, and accounting through self-study, correspondence courses, etc., and carried out specialized training in hydrographic surveying in conjunction with the Zhangweinan Hydrological Test Training of IOC. Through systematic learning, the political and professional qualities of grassroots water conservancy workers have been comprehensively improved, and their practical work abilities have been enhanced, laying a certain theoretical foundation for water conservancy construction and management to reach a new level in the new era.
3. Strengthen the technical foundation and innovative management, and promote scientific water network management.
While strengthening the management of ecological water network projects, we will actively do a good job in popular science and publicity. During the most stressful period of agricultural irrigation, we will guide the development of agricultural irrigation and water fee collection, strengthen water-saving publicity, and encourage all parties to The county uses new water-saving techniques and equipment to maximize the benefits of limited water resources.
At the same time, we changed our thinking in a timely manner, starting from the perspective of ecological water network work, innovating management concepts, and guiding and helping counties to do a good job in county water landscape construction, especially providing sufficient guidance from a conceptual and technical perspective and support, and provided the greatest satisfaction for water sources during the critical period, focusing on guiding Linzhang County to complete the construction of the Qizi Lake landscape water surface, Cheng'an County to complete the urban water landscape construction, and Jize County to complete the Maosui Park water landscape construction, which greatly improved the Regarding the appearance of the urban environment, all counties in the east have implemented water landscape projects with high standards, which have become the highlights of each county during the three-year major change campaign. They have been welcomed by all counties and have achieved a win-win situation for the city and county. Actively organize members to write academic papers and research technological innovations. This year, the "Ideas and Measures for Comprehensive Management of Fuyang River in Handan City" written by our office was published in the "Water Science and Engineering Technology" hosted by the Hebei Water Conservancy Society, and combined with its own In terms of work, from the aspects of water source engineering, irrigation area engineering, water storage engineering, drainage engineering, water measurement engineering, dispatching management, etc., the "Ecological Water Network Management Manual" has been compiled and completed, providing a more detailed foundation for the scientific management of ecological water network in the future. material. In 20xx, our office will continue to work under the leadership of the Municipal Water Conservancy Society and in conjunction with the "Twelfth Five-Year Plan" to implement projects such as the Yellow River Diversion into Han and the South-to-North Water Diversion. Our city will add hundreds of millions of cubic meters of water sources. How to effectively Conduct in-depth research on dispatching and management to benefit the people of the city, and do a good job in water diversion to maximize the role of the ecological water network. Water Conservancy Personal Work Summary 2
In a hurry, one year was spent in busyness and enrichment. During this year, under the careful cultivation and guidance of the unit leaders, I made great progress through my own continuous efforts. Through hard work, both technically and in daily maintenance work, I have made great progress and huge gains:
First of all, through continuous practical operation and written study, I have a more comprehensive grasp of professional maintenance knowledge. Enhanced safety awareness, improved firefighting capabilities, on-site equipment operation capabilities, etc.; supported the company's various policies and policies, consciously abided by various rules and regulations, concentrated on learning technology, and worked hard to do a better job at their jobs. Secondly, at work, I have gained a lot of valuable experience through unexpected accidents during the operation of the power station over the past year and improved my ability in operation and maintenance.
1. Work summary
1. During the operation of the team, take the initiative to assume the obligations and responsibilities of the operating personnel, and have been committed to working hard to build an excellent team, and pay attention to coordination The relationship between team members is beneficial to the development of daily work.
2. Since I served as a water and electricity attendant, I have worked hard to study and analyze the various accounts, analysis records and other relevant reports of the power station in order to improve my personal business skills; in terms of style, I can abide by rules and disciplines and unite my colleagues. , be pragmatic, optimistic and progressive, and always maintain a rigorous and serious work attitude and meticulous work style. Carry forward the fine traditions of hardship, simplicity, thrift and hard work, and willingness to help others in life, always be honest, work diligently, live a hard-working and simple life, always keep in mind your responsibilities and obligations, and be strict with yourself.
3. The team organizes self-examination of safety work. During the inspection, we strengthened the inspection of equipment, focusing on important equipment, such as lightning arresters, respirators, busbars, wire clamps, etc., and thoroughly checked and recorded the safety hazards on the equipment
4. Strengthen feedback Habitual violation work has effectively controlled the occurrence of habitual violations.
2. Insufficient work
In this year’s work, with the joint efforts of our team members, certain results have been achieved. The safety awareness of employees at each station has been further improved, but Some shortcomings were also exposed:
1. There are certain problems in equipment management and foundation, and equipment inspections need to be further strengthened.
2. Various records, new operation tickets, and work ticket filling need to be further standardized and improved.
3. Due to technical reasons, some defects could not be processed in time, which affected the development of the work to a certain extent.
4. In actual work, we still need to increase our efforts to grasp the weak links in safety production and lay the foundation for all future work.
Work plan for 20xx:
The overall idea of ????the safety production work of my team for 11 years is: adhere to the basic policy of "safety first, prevention first", further implement responsibilities, Pay close attention to inspections and actively explore the establishment of a long-term mechanism for safe production.
The overall goal of production safety is to fully complete all production safety indicators issued by our station, resolutely curb the occurrence of major accidents, control the development of minor accidents, maintain the steady development of the safety production situation, and promote the safety of production teams. All work has reached a new level.
Finally, I will continue to study hard, work hard, and do my part in my future work, so as to better complete my future work. Summary of individual work on water conservancy 3
1. Development of water conservancy management work
In recent years, we have adhered to the guiding ideology of “scientific planning, water management in accordance with the law, and standardized management” and in accordance with the “improving management level, improve service quality, and improve operating efficiency", and actively explore the development mechanism of "self-sustainment, self-seeking development", so that water conservancy construction has achieved certain results.
(1) Adhere to equal emphasis on construction management to ensure the safe operation of the project. Most of the water conservancy projects in Gubai Township were built in the 1960s and 1970s. Due to low construction standards and long-term operation, most of the original projects have become problematic reservoirs. In addition, the canal system is unsupported and the standards are low, so irrigation benefits are not great. After on-site investigation, under the leadership of the government and the Water Conservancy Bureau, we actively carried out work, scientific planning and careful construction. In recent years, investment in reservoir construction has increased year by year. The construction of reservoir risk relief and reinforcement projects has provided favorable conditions for improving the current situation of the reservoirs. In recent years, two reservoirs have been repaired, which can basically guarantee the tasks of flood control in summer and drought prevention in winter. . The improvement of 28 Sanping ponds has also been completed. According to preliminary estimates, nearly a thousand acres of farmland can be effectively irrigated. In 2006 and XX, nearly 13 kilometers of water canals were renovated and built, which greatly improved the water canal coverage rate in Gubai Township. While the project was under construction, we immediately began to consider the management of the reservoir project. In order to fully mobilize the enthusiasm of villagers in various water conservancy areas, we formulated detailed management methods and recruited village cadres to do a good job in managing water for the villagers patiently and meticulously. Ideological work, realize the importance of water conservancy construction. Strengthen publicity, manage water according to law, and create a good working environment. On the one hand, we strengthen the publicity of water laws and regulations, educate the public to put safety first and protect water conservancy projects; on the other hand, we increase law enforcement, promptly stop and seriously handle violations; at the same time, we strive for the support of leaders at all levels and local village cadres , to help coordinate and deal with local conflicts, and after long-term and meticulous work, the management environment has been greatly improved. In particular, through the confirmation of rights and demarcation, the scope of reservoir management has been clarified, water management units have legal management rights, and the external conditions for reservoir management have been completely improved. We have also established an operating mechanism of "living the reservoir to support the reservoir and becoming self-sufficient". We make full use of water surface resources, vigorously develop water conservancy and fisheries, and strive to improve operating efficiency and income-generating capabilities.
(2) Make full use of tap water resources and strive to improve operating efficiency.
In the water supply project, after comprehensive consideration by the government and the Water Conservancy Bureau, we actively explored a new model of water supply management in townships and towns, and used a combination of individual contracting and water management station management to revitalize water resources, which truly achieved Effective use and effective management. The number of tap water users in our Gubai Township has gradually expanded from less than 200 households to more than 40 households since I became the director of the water pipe station. We fully tapped our potential and rationally developed and utilized water resources. This new mechanism accelerates the reform of the water conservancy investment and financing system, broadens the sources of funds for water conservancy construction, and actively supports the combination of individual contracting and water management station management, further broadening channels for the development of township water conservancy undertakings.
I am in my thirties, healthy, energetic and professional, and able to devote myself wholeheartedly to the work I love. Therefore, I am also full of hope for future work.
2. Plans for future work:
1. Strengthen study, proactively do daily work, and strive to improve service quality. Only by continuously strengthening the study of various management systems and relevant business knowledge of water management units and constantly enriching ourselves can we be qualified for the job requirements. Water management station personnel are responsible for implementing policies and communicating internally and externally. At the same time, water management work is actually service work. Therefore, water pipe workers are both glorious and hard-working, and need to have a strong sense of professionalism and responsibility; they need to have strong work ability and work art. In addition, I must strengthen party spirit training, obey arrangements, be consistent in words and deeds, take into account the overall situation, resolutely maintain the unity of the leadership team, and maintain the image of the leadership. At the same time, we should give full play to the enthusiasm of the staff at the water management station, so that they can strive for excellence in their work, continuously improve the service quality, and do a good job in water conservancy services.
2. Be a good staff assistant and obey the decisions of superior leaders. I will promptly and accurately grasp the dynamics of all aspects of work, and promptly feedback all aspects of information to the leadership; I will also pay attention to investigation and analysis, proactively offer suggestions and suggestions, conduct scientific analysis and judgment on various situations, and provide reliable basis for leadership decision-making.
3. Further improve flood prevention and drought relief work. Flood prevention and drought relief work is a long-term and important task that must be taken seriously and unremittingly. Local heavy rains and floods are inevitable every year in Yibin County. Water conservancy projects have insufficient water storage, and drought is likely to develop. It is necessary to establish mental preparations to prevent severe floods and droughts, further implement the flood control and drought relief responsibility system, do a good job in establishing the annual reservoir inspection system, continue to complete the drought relief plan, improve the flood control plan, continue to do a good job in the construction of the three prevention command system projects in various places, and ensure flood control Safety, water supply safety, food production safety, safeguarding the safety of people's lives and property, and minimizing disaster losses.
4. Do a good job in various water conservancy work focusing on rural water conservancy. Water conservancy work must focus on serving "agriculture, rural areas and farmers", and must closely focus on the strategic deployment of building a new socialist countryside, with the goal of improving comprehensive agricultural production capacity, promoting rural economic development, and increasing farmers' income, and continuously strengthen the construction of rural water conservancy infrastructure. Today we need to summarize experiences and lessons, consolidate the results of alleviating rural drinking water difficulties, and further solve rural drinking water safety issues. Water Conservancy Individual Work Summary 4
In 20xx, under the correct leadership of the Water Conservancy Bureau Party Committee, with the strong assistance of the bureau leaders and colleagues and the cooperation of various units, with the starting point of improving one's own cultivation and business skills, the results were better Completed various tasks for the year. The work for the whole year is summarized as follows. If there are any shortcomings, I hope all leaders and colleagues will provide criticism and corrections.
1. Strengthen learning and strive to improve your own quality.
Seriously study the party’s various principles and policies and water conservancy regulations and policies. Actively participated in the "Striving for Excellence" activities and the "In-depth Study and Practice of the Scientific Outlook on Development" activities, learned the important spirit of the 17th National Congress of the Communist Party of China and the Fifth Plenary Session of the 17th Central Committee of the Communist Party of China, and participated in the training of the Municipal Radio and Television University. Through study, I have established a correct world view, outlook on life, and values, constantly improved my theoretical knowledge and professional level, and continued to carry forward the responsible and realistic spirit of the water conservancy industry in accordance with the requirements of being pragmatic and honest for the people, and doing a solid job in the water conservancy industry. In rural water conservancy work, we must conscientiously solve various problems in practical work, fundamentally change work styles and attitudes, and effectively promote the completion of various tasks.
2. Main tasks
1. Responsible for the water allocation and flood and drought prevention work in the new town: actively coordinate with various water use units, successfully complete the irrigation work in the first half of the year, and The water use plan and irrigation progress of each round were reported in a timely manner. The town has an actual irrigation area of ??24,356 acres, of which: 5,599 acres are irrigated by river water and 18,757 acres are irrigated by well water. In the first half of the year, 3.502 million cubic meters of river water were used and 11.55 million cubic meters of groundwater were extracted. Irrigation work of 86,121 acres was completed, including: 20,099 acres of spring irrigation and 66,022 acres of summer irrigation. During the water operation, be responsible and responsible, stick to your job, and keep abreast of changes in water volume operation. During the peak period of water use, go deep into the fields to understand the irrigation water situation and do a good job in water allocation.
During the flood season, we adhere to the 24-hour duty system, observe the flood situation in a timely manner, and report any problems in a timely manner.
2. In July, he was seconded to the Water Conservancy Project Office and participated in the first phase ecological environment management project of the Tuolaihe urban section in Jiayuguan City, responsible for the technical management and coordination of the fourth section. Up to now, *** has completed an investment of 5.2997 million yuan, including 3,568 cubic meters of cast-in-place C20 concrete, 1,574 cubic meters of cast-in-place C25 reinforced concrete, 39.7 tons of steel bars, 2,156.4 cubic meters of mortar stone, and 46,884 square meters of geotechnical anti-seepage membranes. , backfilled with 13,065 cubic meters of fine sand, 123,102 cubic meters of excavated sand and gravel, 23,864 cubic meters of backfilled sand and gravel, and 960 cubic meters of cultivated soil. During the construction of the project, they stayed on the front line of construction, fought against the scorching heat and severe cold, withstood the attack of catastrophic floods, overcame severe weather such as wind and rain, and worked hard to meet the construction deadline and progress, so that the project achieved phased results. At present, 280 meters of central partition wall, 2 drop weirs and 46,884 square meters of anti-seepage membrane have been completed. The project is ready for water circulation.
3. Other work. In March, we participated in the city's water law publicity activities and used the new town market time to distribute promotional materials to farmers, strengthened farmers' awareness of water conservancy laws and regulations, and enhanced water conservation. concept. In April, the channels in the Xincheng Irrigation District were inspected and repaired in a timely manner to ensure normal irrigation throughout the year.
Earnestly completed the statistical reporting of various data from the bureau, and completed other tasks assigned by the station leaders while maintaining quality and quantity.
3. Find gaps and continuously improve business skills
In the past year, although I have done a lot of work, there is still a big gap between the strict requirements of the leaders, and there are also shortcomings in the work. , For example, the awareness of innovation is not strong, the depth of theoretical knowledge learning is not enough, it is difficult to solve practical problems, and the requirements for oneself are not strict enough. In the future work, we must overcome shortcomings, emancipate our minds, seek truth from facts, keep pace with the times, strengthen the study of the scientific outlook on development, and better complete various tasks assigned by the leadership. Water Conservancy Personal Work Summary 5
In 20xx, under the correct leadership of the Party Committee and Administration of the District Water Conservancy Bureau, and with the guidance and help of the Municipal Water Conservancy Department, we adopted the socialist concept of honor and disgrace, fully utilized the benefits of water conservancy projects, and conscientiously performed With the joint efforts of all cadres and employees, the various functions of the unit have successfully completed various tasks and targets assigned by superiors. This year’s work summary is now reported as follows:
1. , Work review
(1) Flood prevention work
Flood prevention work is the main function of our company to exert social benefits. According to the specific circumstances of the invasion of typhoons "Maisa" and "Kanu", this year's flood prevention preparations were made earlier, more fully and in place than last year. We have mainly taken the following specific measures:
First, establish a constant mindset, overcome the paralysis of luck, enhance the sense of urgency and responsibility, tighten the string of flood prevention at all times, and repeatedly educate cadres and employees, It is better to believe that it exists than to believe that it does not exist. Flood prevention safety is related to Songjiang's economic development, social stability and the safety of people's lives and property, and must be strictly guarded to ensure safety;
The second is to carry out serious and solid flood prevention inspections based on the predictions of meteorological experts.
Carry out blanket inspections on the institute's 25 sets of water (pump) gates and two rubber dams, and strictly follow the pre-flood inspection requirements of the municipal and district water affairs bureaus to highlight key points, achieve "six no-misses", strictly control, eliminate risks and strengthen , eradicate various hidden dangers, and ensure the normal operation of facilities and equipment;
The third is to implement the flood prevention responsibility system, establish a flood prevention and typhoon prevention leading group with the director as the leader, and clarify that the main administrative leaders are responsible for flood prevention and typhoon prevention. There is one responsible person, the leader in charge is the direct responsible person, and the heads of each department are the specific responsible persons;
The fourth is to further improve the flood prevention, typhoon and disaster relief system, and systematically and comprehensively formulate flood prevention and typhoon prevention plans and emergency response Prepare a contingency plan to ensure that organization and command, rescue personnel and flood control material reserves are in place. Once encountering various disastrous weather attacks, we can handle it calmly, respond in an orderly manner, and be foolproof;
The fifth is to strengthen all, The two-level gate duty system insists that the headquarters and the water gate are on duty 24 hours a day to ensure that the superiors and subordinates are reported, and the government orders are smooth;
The sixth is to set up "Five Notices" publicity boards at each water gate. That is, the boat owners are informed of rain conditions, water conditions, flood conditions, tide conditions, and work conditions to ensure the safety of boat people's navigation, and are required to cooperate in flood prevention and typhoon prevention.
Although there was no major disastrous weather this year, there were no near misses, but these measures played a positive role in preventing the peripheral impact of two typhoons, eight astronomical high tides, and 11 super-warning water levels. , ensuring a safe flood season in XX.
(2) Water diversion work
Water diversion work is another major function of our institute’s water conservancy project to achieve social benefits, and has become an extremely important perennial work task of our institute. . It is our unshirkable and unshirkable responsibility to unremittingly dispatch water resources, improve the quality of water bodies in the control area, meet the water quality requirements of society and the people, promote the sustainable development of Songjiang economy, and consolidate and develop the Songjiang National Water Conservancy and Ecological Scenic Area. To this end, we have mainly done the following in the water diversion work:
First, implement the superior water diversion instructions to the letter;
Second, open and close the gates in a timely manner, It is necessary to exhaust all possible problems and clearly stipulate that each sluice must have a dedicated person in charge and keep water transfer records for later investigation;
The third is to require each sluice to open an automated detection system to provide a visual level for superiors and provide In the future, we will further improve the water diversion plan to provide a true, reliable and scientific basis;
The fourth is to correctly handle the relationship between water diversion, flood control and ship navigation. While doing a good job in water diversion, we must also ensure that flood control, ship navigation Navigation safety.
(3) Navigation charges
On the premise of ensuring the safety of ship navigation and providing high-quality services, collecting sufficient ship lock fees is our self-maintenance to ensure the normal operation of the locks. The need for operation is also the need to ensure the healthy operation of the unit economy. Our institute currently has five main navigation toll locks, all of which have designed navigation tonnage of 100 tons. As the tonnage of ships passing through the locks becomes larger and larger, it creates a conflict between permitted navigation and actual navigation, and it is easy to cause hydraulic structures, ship navigation, etc. Security Question. In order to solve the above contradictions and problems, we have taken the following effective measures:
First, go deep into the scene to provide command and reasonable dispatch. According to changes in water levels, the number and tonnage of ships on the inner and outer rivers, carefully and meticulously arrange the entry and exit of ships into the lock;
The second is to continue to obtain license plates, call numbers to enter the lock, and implement advance registration for large-tonnage ships entering and leaving the lock. , reasonable arrangements;
The third is that starting from May, free lock information cards will be issued for boat people at the five major navigation toll gates such as Youdun Port on a regular basis;
The fourth is to cooperate with the Shuangshui Police Station, The local maritime department coordinated and carried out special rectifications on many occasions. The main contents of the rectification include checking the ship shipping book, inspection book, driving license, gate information card and other documents, and handling and rectifying some illegal behaviors;
Fifth, in addition to the Dashengjing Water Lock, the main navigation The sluice is open to navigation 24 hours a day and night, and the waiting time for the sluice, under normal circumstances, is no more than 1 hour during the day and no more than 2 hours at night.
All these measures have significantly improved the navigation order of the lock and effectively improved the satisfaction of ship owners passing through the lock.
In addition, while insisting on collecting sufficient gate fees, our office takes the construction of political ethics as the driving force to continuously improve the transparency of fees. According to the requirements of superiors, we make "five public" signs at the fee window, actively accept the supervision of ship owners, and continuously strengthen Internal supervision makes charging work standardized and orderly. Although the lock fees in 20XX have been slightly reduced due to the impact of national macro-control, our office has taken effective measures to work hard to collect and collect the ships, measure the ships, verify the actual tonnage of the ships, apply for free lock information cards for ship owners, and strengthen the supervision of ship owners. On-site inspection and inspection of lock vessels. As of the end of November, *** had collected 25.16 million yuan in gate fees.
(4) Engineering maintenance and repair.
In order to ensure flood control safety, increase the safe operation coefficient of the sluice, improve the operation capacity of the sluice, and beautify the sluice environment, our institute invested 6.8 million yuan this year to repair hydraulic buildings, facilities and equipment, and greening layout. Renovation, the main projects are:
1. Add shower rooms at 7 water gates including Maozhu Port;
2. Electrical renovation of Dazhangjing high-voltage distribution room;
3. Dazhangjing Pump Gate Civil Construction Part Maintenance Project;
4. Yangnan Port, Beijiehe, Shixian Port, and Erlijing Decoration Maintenance Project;
5. Dazhangjing outer river approach channel emergency repair project;
6. Tongbotang revetment emergency repair project;
7. Zhujiagang star sluice building maintenance project;
8. Maintenance and decoration project of the office building;
9. Video surveillance project of Youdun Port Water Gate;
10. Operation cabinets of Dazhangjing, Liuleitang and Puhuitang and electrical renovation;
11. Yutang management room, operation room, and wall renovation;
12. Dazhangjing, Huatianjing, and Zhujiagang sluice greening renovation.
The above 12 projects have all been completed and put into use, and the data have been archived. ;